The project comprises remedial works to the heating system including readjustment of system operating pressures, change of pressurization equipment, flushing of existing pipework etc. Installation of dirt separators and re-gassing module, replacement of radiators, removal and disposal of redundant equipment.
The under-croft of the building was used as a bomb shelter during the war.